網路城邦
回本城市首頁 悠遊海闊天空
市長:tu  副市長:
加入本城市推薦本城市加入我的最愛訂閱最新文章
udn城市文學創作其他【悠遊海闊天空】城市/討論區/
討論區RED training 字體:
上一個討論主題 回文章列表 下一個討論主題
335-339
 瀏覽436|回應0推薦0

tu
等級:8
留言加入好友

335-339.

Sever Maintenance Notice

Date:October6-October 8 Time:8:00A.M.-5:00P.M.

Address:Singlap Building,Bennett Tower

Engineers:Arjun Ruth, Rachel Barnes

Details:Replace spare partsM6FL11,fix overheating issues,and carry out routine maintenance.

.

Progress checklist: Rewired ATN cable √
(dispose of old blue one as depicted) Ran
system check of VIS system √ (no errors found)

Other routine maintenance✔️ (no pending repairs

required) Suggestions and recommendations as

follows:

.

Overheating issue has been “diagnosed” “repeatedly”

over the 3 previous checks and a thorough run down

of the problem found that the cause seems to be

due to a change in the “vent” “positioning”,causing

little airflow around the machine.

.

Recommendation: Affix one extra fan to the current one mounted on the side of the machine or reposition vents back to the original place.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

..

.

...

.

.

..

.

.

.

..

.

.

..

.

.

.

.

.

..



本文於 修改第 7 次
回應 回應給此人 推薦文章 列印 加入我的文摘

引用
引用網址:https://city.udn.com/forum/trackback.jsp?no=57628&aid=7122478